Skip to content

ARTICLES

YHU Terminal at MET Wins Gold

YHU Terminal at MET Wins Gold NextGen Systems Group is proud to announce that the new YHU Terminal at MET – Montréal Metropolitan Airport has won Gold at the 19th
Read More

A Passenger Boarding Bridge Can Still Work and Yet Also Be a Risk

A Passenger Boarding Bridge Can Still Work and Yet Also Be a Risk Even while passenger boarding bridges are operating reliably, as they age, hidden operational, maintenance, safety and capital
Read More

Toronto Pearson extends transformation with $1.5 billion in terminal modernization

NextGen Systems Group is part of the NORR-DIALOG design team for the Toronto Pearson Terminal 1 and Terminal 3 Revitalization Program. https://www.newswire.ca/news-releases/toronto-pearson-extends-transformation-with-1-5-billion-in-terminal-modernization-806146853.html
Read More

Supporting the New Passenger Terminal at MET – Montréal Metropolitan Airport (YHU)

NextGen Systems Group was pleased to support the development of the new passenger terminal at MET – Montréal Metropolitan Airport, helping deliver critical airport special systems from concept through commissioning.
Read More
Plan ahead to prepare for passenger return

Plan ahead to prepare for passenger return

The reduction in airport traffic in 2020 caused many airports to reduce staff, shut down portions of their terminal buildings, and change operations to suit. Some airports shut down the
Read More
Comprehensive systems training to ensure smooth operations

Comprehensive systems training to ensure smooth operations

When the new terminal building at Bermuda’s L.F. Wade International Airport opened on December 9, 2020, Bermudians and travelers were ready for the improved facilities. The nearly US$400m, 26,756m² facility
Read More