YHU Terminal at MET Wins Gold NextGen Systems Group is proud to announce that the new YHU Terminal at MET – Montréal Metropolitan Airport has won Gold at the 19th
A Passenger Boarding Bridge Can Still Work and Yet Also Be a Risk Even while passenger boarding bridges are operating reliably, as they age, hidden operational, maintenance, safety and capital
NextGen Systems Group is part of the NORR-DIALOG design team for the Toronto Pearson Terminal 1 and Terminal 3 Revitalization Program. https://www.newswire.ca/news-releases/toronto-pearson-extends-transformation-with-1-5-billion-in-terminal-modernization-806146853.html
NextGen Systems Group was pleased to support the development of the new passenger terminal at MET – Montréal Metropolitan Airport, helping deliver critical airport special systems from concept through commissioning.
The reduction in airport traffic in 2020 caused many airports to reduce staff, shut down portions of their terminal buildings, and change operations to suit. Some airports shut down the
When the new terminal building at Bermuda’s L.F. Wade International Airport opened on December 9, 2020, Bermudians and travelers were ready for the improved facilities. The nearly US$400m, 26,756m² facility